| 注册
首页|期刊导航|电力勘测设计|分公司制的电力总承包项目费用动态管理分析

分公司制的电力总承包项目费用动态管理分析

胡益

电力勘测设计Issue(3):90-94,5.
电力勘测设计Issue(3):90-94,5.DOI:10.13500/j.dlkcsj.issn1671-9913.2025.03.016

分公司制的电力总承包项目费用动态管理分析

Analysis on Dynamic Cost Management of Electric EPC Projects Based on Branch Company System

胡益1

作者信息

  • 1. 中国电力工程顾问集团华东电力设计院有限公司,上海 200063
  • 折叠

摘要

Abstract

The proportion of profits from general contracting projects in the total profits of enterprises is also increasing,so the cost management in project management will also occupy a more important position.Dynamic management of project costs is the key work to achieve cost objectives.This article establishes a dynamic management process for the entire project process,and introduces in detail the content and requirements of key links such as cost target determination,cost plan formulation,cost analysis,and cost correction measures,providing a reference for better implementation of cost management in EPC projects.

关键词

电力总承包项目/费用管理/纠偏措施

Key words

electric general contracting project/cost management/deviation correction measure

分类

能源科技

引用本文复制引用

胡益..分公司制的电力总承包项目费用动态管理分析[J].电力勘测设计,2025,(3):90-94,5.

电力勘测设计

1671-9913

访问量0
|
下载量0
段落导航相关论文