强激光与粒子束2025,Vol.37Issue(4):51-56,6.DOI:10.11884/HPLPB202537.240396
云光二号加速器全系统准直测量与调节
Alignment measurement and adjustment for the whole system of Yunguang Ⅱ accelerator
何德雨 1丛培天 1呼义翔 1杨实 1周亚伟 1钟爱旭 1董敏 1尹佳辉 1罗维熙 1曾江涛1
作者信息
- 1. 西北核技术研究所,强脉冲辐射环境模拟与效应全国重点实验室,西安 710024
- 折叠
摘要
Abstract
Yunguang Ⅱ accelerator adopts induction voltage adder technique route.The whole system consists of 12 Marx generators,24 water lines,12 induction cavities and a long magnetically insulated transmission line.Because of its large scale,many series and complex structure,the alignment measurement technique is required to ensure the whole assembly precision,especially the coaxiality of the induction cavity and the magnetically insulated transmission line.Aiming at the technical defects of complex and complicated measuring system of similar equipment in foreign countries,an all-system alignment measuring scheme using laser tracker as the core means is put forward.The alignment and adjustment of the generator output flange,induction cavity guide rail,magnetically insulation transmission line and its guide rail are completed respectively,especially a measuring mechanism of target base which can realize double-direction inner hole centering is designed.With high precision and efficiency,the alignment measurement and adjustment of 12-stage induction cavity in series is realized,which lays a good technical foundation for the construction of larger-scale facilities.关键词
脉冲功率/云光二号加速器/准直测量/激光跟踪仪/感应腔/磁绝缘传输线Key words
pulsed power/Yunguang Ⅱ accelerator/alignment measurement/laser tracker/induction cavity/magnetically insulated transmission line分类
核科学引用本文复制引用
何德雨,丛培天,呼义翔,杨实,周亚伟,钟爱旭,董敏,尹佳辉,罗维熙,曾江涛..云光二号加速器全系统准直测量与调节[J].强激光与粒子束,2025,37(4):51-56,6.