摘要

Abstract

In response to the problems of broken roof,difficult anchoring,easy roof caving and others in the lower layered roadway of Zhaogu No.2 Mine of Henan Energy Coking Coal Company,FLAC2D-PFC coupled numerical simulation method is adopted to analyze the stress distribution and deformation characteristics of the roadway surrounding rock under the layered mining condition.The roadway surrounding rock has significant asymmetric deformation,affected by the accumulation of gangue and upper layered residual coal pillars,the roof is severely broken.A grouting reinforcement and pre-control technology is proposed,by grouting anchor cables,filling surrounding rock cracks,enhancing the integrity and bearing capacity of rock mass to ensure the stability and adaptability of support structures.The application results show that grouting reinforcement pre-control technology can effectively control the deformation of roadway surrounding rock,significantly reduce the risk of roof caving,extend the service life of support structures,improve the working environment,and provide solid guarantees for the safe and efficient production of mines.

关键词

煤巷/破碎/注浆/支护

Key words

coal roadway/broken/grouting/support