| 注册
首页|期刊导航|人民黄河|多沙河流水库径流泥沙联合调节方式研究

多沙河流水库径流泥沙联合调节方式研究

陈翠霞 王海霞 温志超 梁艳洁 王天格

人民黄河2025,Vol.47Issue(4):32-37,6.
人民黄河2025,Vol.47Issue(4):32-37,6.DOI:10.3969/j.issn.1000-1379.2025.04.006

多沙河流水库径流泥沙联合调节方式研究

Study on the Joint Regulation of Runoff and Sediment of Water Supply Reservoirs in Sediment-Laden River

陈翠霞 1王海霞 2温志超 1梁艳洁 1王天格1

作者信息

  • 1. 黄河勘测规划设计研究院有限公司,河南 郑州 450003||水利部黄河流域水治理与水安全重点实验室(筹),河南 郑州 450003
  • 2. 新乡市大功引黄供水有限责任公司,河南 新乡 453300
  • 折叠

摘要

Abstract

There is independence and integration between water supply and sediment reduction in sediment-laden river reservoirs.How to maintain effective storage capacity and meet water supply requirements for a long time is one of the issues to be solved in the efficient opera-tion of sediment-laden river reservoirs.In this paper,Dongzhuang Reservoir of Jinghe River was taken as the research object.Through the analysis of measured data and mathematical model calculation,the measured hydrological sediment and cross-section erosion and deposition in the lower reaches of Jinghe River and Weihe River were analyzed.The reservoir sediment discharge flow index which was beneficial to re-duce the sediment deposition in the lower reaches of Weihe River and maintain the effective reservoir capacity for a long time was studied,and the joint regulation mode of reservoir runoff and sediment was put forward.The outcomes show that during the main flood season for the sediment interception period from July to September,when the inflow is greater than 600 m3/s and the sediment concentration is greater than 300 kg/m3,the Dongzhuang Reservoir is open for sediment discharge.As the normal operation period,during the main flood season from July to September,when the inflow exceeds 300 m3/s,the Dongzhuang Reservoir will open for sediment discharge.The reservoir cannot supply water during the sediment discharge period.The joint regulation of the Dongzhuang Reservoir and the surrounding four storage reservoirs can reduce the deposition of the lower reaches of the Weihe River by 11 million tons per year,increase the guarantee rate of agricultural irrigation from 30%to 50%,and increase the guarantee rate of industrial water supply from 57%to 95%.

关键词

多沙河流/供水/库容保持/东庄水库/泾河/渭河下游

Key words

sediment-laden river/water supply/reservoir capacity maintenance/Dongzhuang Reservoir/Jinghe River/Lower Weihe River

分类

水利科学

引用本文复制引用

陈翠霞,王海霞,温志超,梁艳洁,王天格..多沙河流水库径流泥沙联合调节方式研究[J].人民黄河,2025,47(4):32-37,6.

基金项目

国家重点研发计划项目(2022YFC3080300) (2022YFC3080300)

国家自然科学基金资助项目(U22A20237,U2243237) (U22A20237,U2243237)

水利部重大科技专项(SKR-2022030) (SKR-2022030)

人民黄河

OA北大核心

1000-1379

访问量0
|
下载量0
段落导航相关论文