全断面隧道掘进机监理现状及发展思考

赵建

设备监理Issue(1):12-15,20,5.
设备监理Issue(1):12-15,20,5.DOI:10.19919/j.issn.2095-2465.2025.02.002

全断面隧道掘进机监理现状及发展思考

Current Situation and Thoughts on Development of Full Face Tunnel Boring Machine Supervision

赵建1

作者信息

  • 1. 中铁隧道局集团有限公司设备分公司 广州 510000
  • 折叠

摘要

Abstract

With the rapid advancement of underground space development and utilization in China,the construction of tunnel boring machines(TBMs)has reached a high level of maturity and is extensively applied in this field.Gradually,monitoring and controlling the entire TBM operation as well as assessing the final outcomes will likely become standard practice.This paper provides an analysis of the current state of supervision within the full face tunnel boring machine sector through a statistical overview,while also examining typical enterprises'conditions.It evaluates aspects such as business operations,workforce,and service offerings from the viewpoint of full face tunnel boring machine equipment supervision,offering insights and recommendations for enhancing this supervisory domain.

关键词

全断面隧道掘进机/盾构机/设备监理/再制造

Key words

Full face tunnel boring machine/Shield machine/Equipment supervision/Remanufacturing