| 注册
首页|期刊导航|设备监理|换热器制造过程典型问题分析

换热器制造过程典型问题分析

余兵 祁新飞

设备监理Issue(1):38-42,5.
设备监理Issue(1):38-42,5.DOI:10.19919/j.issn.2095-2465.2025.02.008

换热器制造过程典型问题分析

Analysis of Typical Problems in the Manufacturing Process of Heat Exchangers

余兵 1祁新飞1

作者信息

  • 1. 南京三方化工设备监理有限公司 南京 210036
  • 折叠

摘要

Abstract

Heat exchanger is a type of heat exchange equipment,which is widely used in various heat exchange conditions.It is a very common pressure vessel and plays a crucial role in the petroleum and chemical industries.Its quality and performance directly affect the normal and safe operation of the entire plant.Based on the typical problems found during actual supervision process,such as wrong electrode,welding defects for welding seams between piping and tube-sheet,quality management of outsourced/purchased parts,welding defects of nozzle to shell,and gasket installation issues,this paper analyzed and summarized the lesson learned,and put forward reasonable suggestions for improving the subsequent supervision work.

关键词

换热器制造/管头焊接缺陷/封头/垫片/质量管理

Key words

Heat exchanger manufacturing/Welding defects between piping and tube-sheet/Head/Gasket/Quality management

分类

通用工业技术

引用本文复制引用

余兵,祁新飞..换热器制造过程典型问题分析[J].设备监理,2025,(1):38-42,5.

设备监理

2095-2465

访问量0
|
下载量0
段落导航相关论文