中国防汛抗旱2025,Vol.35Issue(4):63-69,7.DOI:10.16867/j.issn.1673-9264.2025034
天津市杨庄水库"2024.8.10"暴雨洪水复盘分析
Analysis of"2024.8.10"rainstorm flood in Yangzhuang Reservoir of Tianjin City
摘要
Abstract
From August 9 to 10 of 2024,a short-term heavy rainstorm occurred in the Juhe River,and the flood peak flow of Yangzhuang Reservoir in Tianjin City reached the historical maximum of 1 100 m3/s.In this paper,based on the analysis of the characteristics of the rainstorm and flood characteristics,the hydrological and hydrodynamic models are constructed based on CNFF and IFMS/Urbans to simulate the rainstorm and flood process.The results show that:the return period of rainfall is 20~50 years,the return period of flood peak flow is 10~20 years,and the maximum discharge flow is 500 m3/s;The flood dispatching process effectively reduced the upstream flood peak by more than 50%,and there was no superposition of the maximum outflow and the flood peak,which gave full play to the flood control role of Yangzhuang Reservoir;River flood analysis and ground inundation analysis simulation are basically consistent with hydrological observation and field investigation.It is suggested that the reservoir should adopt the pre-discharge method in combination with the weather forecast during flood seasons,reduce the water level of the reservoir in advance,and control the discharge as far as possible at 300 m3/s and below.The research results can provide reference for flood forecasting and flood operation of Yangzhuang Reservoir.关键词
杨庄水库/暴雨洪水/中国山洪水文模型/IFMS/Urbans/复盘分析/天津市Key words
Yangzhuang Reservoir/rainstorm floods/CNFF/IFMS/Urbans/retrospective analysis/Tianjin City分类
建筑与水利引用本文复制引用
尹雅清,刘桓语,李匡,刘成荣,赵英虎,李亭,张丽伟..天津市杨庄水库"2024.8.10"暴雨洪水复盘分析[J].中国防汛抗旱,2025,35(4):63-69,7.基金项目
国家重点研发计划项目(2023WFC203200) (2023WFC203200)
中国水利水电科学研究院十四五"五大人才"计划项目(WHO1458032021) (WHO1458032021)
天津市防洪调度应急指挥平台建设项目(JZ120205A0042024). (JZ120205A0042024)