| 注册
首页|期刊导航|采矿与岩层控制工程学报|煤层顶板"人造解放层"采动响应规律相似模拟研究

煤层顶板"人造解放层"采动响应规律相似模拟研究

潘俊锋 邬建宏 贺海鸿 高家明 马小辉 杜涛涛 吕大钊

采矿与岩层控制工程学报2025,Vol.7Issue(2):1-17,17.
采矿与岩层控制工程学报2025,Vol.7Issue(2):1-17,17.DOI:10.13532/j.jmsce.cn10-1638/td.2024-1411

煤层顶板"人造解放层"采动响应规律相似模拟研究

Similarity simulation study on the mining response law of artificial stress relief layer in coal seam roof

潘俊锋 1邬建宏 1贺海鸿 2高家明 1马小辉 2杜涛涛 1吕大钊2

作者信息

  • 1. 中煤科工开采研究院有限公司,北京 100013||煤矿灾害防控全国重点实验室 冲击地压室,北京 100013
  • 2. 陕西彬长矿业集团有限公司,陕西 咸阳 712000
  • 折叠

摘要

Abstract

The"L"-shaped fracturing well on the ground breaks the thick and hard roof,forming an artificial stress relief layer above the coal seam,which can significantly reduce the risk of rockburst.Constraining at the engineering site,it is difficult to reveal the structural and load changes of the overlying rock during the mining after the formation of the artificial stress relief layer.Using OFDR distributed optical fiber,pressure box,and three-dimensional optical digital speckle monitoring,prefracturing of the thick and hard roof area is carried out to investigate the structure and load response law of the overlying rock after the formation of the artificial stress relief layer.The results show that fracturing effectively weakens the integrity and strength of thick and hard rock layers.During the process of advancing the working face,the overlying rock can collapse in a timely and orderly manner,and the cantilever area and length are reduced.The"F"-shaped structure of the long cantilever beam under non-fracturing conditions is transformed into the"F"-shaped structure of the short cantilever beam after fracturing.After fracturing,the fracture of rock layers no longer follows the formula of ultimate fracture step distance,but is controlled by the fracturing cracks.The fractured layer and nearby key layers should be fractured in advance.The fracturing cracks develop again under the action of mining stress,and a phenomenon of slow and advanced development of cracks in the local overlying roof rock is observed.The fractured blocks of overlying rock fall along fractures,resulting in a decrease by 17%in the step distance of mining-induced pressure.At the same time,no large-scale collapse of the overlying rock occur due to the simultaneous rupture of the key layer and the basic roof in the middle and high positions after fracturing.During the process of working face advance,the artificial stress relief layer formed by the top plate fracturing acts as a barrier,blocking the hard transmission of loads between the upper and lower layers.At the same time,cracks develop inside the fracturing layer.During the transition from triaxial to biaxial loading,the structure deteriorates continuously,thereby reducing the deformation of the overlying rock and the stress concentration of coal seam in advance.

关键词

厚硬顶板/区域卸压/人造解放层/采动响应/光纤监测/岩层活动

Key words

thick and hard top plate/regional pressure relief/artificial stess relief layer/mining response/fiber optic monitoring/rock activity

分类

矿山工程

引用本文复制引用

潘俊锋,邬建宏,贺海鸿,高家明,马小辉,杜涛涛,吕大钊..煤层顶板"人造解放层"采动响应规律相似模拟研究[J].采矿与岩层控制工程学报,2025,7(2):1-17,17.

基金项目

国家重点研发计划资助项目(2022YFC3004604) (2022YFC3004604)

国家自然科学基金面上资助项目(52174186) (52174186)

国家高层次人才计划资助项目(020403050009) (020403050009)

采矿与岩层控制工程学报

OA北大核心

2096-7187

访问量0
|
下载量0
段落导航相关论文