摘要

Abstract

The construction of pumped storage power stations using built comprehensive utilization reservoirs can save investment in reservoir engineering,fully leverage the comprehensive benefits of built reservoirs,accelerate the construction speed of pumped storage power stations,and achieve optimal utilization of resources.This article takes the Shicao Pumped Storage Power Station in Deqing,Guangdong Province as an example to explore a plan to use the built comprehensive utilization reservoir to construct a pumped storage power station while ensuring its original basic functions.The analysis results can provide relevant research and design references.

关键词

抽水蓄能电站/已建水库/洪水调节/灌溉库容

Key words

pumped-storage power station/built reservoir/flood regulation/irrigation storage capacity