| 注册
首页|期刊导航|广西水利水电|大藤峡水利枢纽工程一期下闸蓄水移民安置度汛方案

大藤峡水利枢纽工程一期下闸蓄水移民安置度汛方案

樊现元

广西水利水电Issue(2):111-114,4.
广西水利水电Issue(2):111-114,4.

大藤峡水利枢纽工程一期下闸蓄水移民安置度汛方案

Flood period plan of resettlement for the first stage of water storage of Datengxia Gorge Water Conservancy Project

樊现元1

作者信息

  • 1. 广西水利电力勘测设计研究院有限责任公司,南宁 530023
  • 折叠

摘要

Abstract

The inundation due to Dtengxia Gorge Water Conservancy Project involves many types and a large number of physical objects.In order to ensure the life and property safety of migrants during flood period,the flood control standard and scope were determined in accordance with relevant specifications;investigation and statistics of physi-cal objects within the flood control area were conducted;the flood period plan of resettlement was drawn up accord-ing to the characteristics of the physical objects influenced by inundation and the progress of the resettlement work,so as to laid a solid foundation for the safety during flood period.

关键词

水利工程/淹没区/度汛方案/大藤峡水利枢纽

Key words

water conservancy project/inundation area/flood period plan/Datengxia Gorge Water Conservancy Project

分类

建筑与水利

引用本文复制引用

樊现元..大藤峡水利枢纽工程一期下闸蓄水移民安置度汛方案[J].广西水利水电,2025,(2):111-114,4.

广西水利水电

1003-1510

访问量2
|
下载量0
段落导航相关论文