广西水利水电Issue(2):111-114,4.
大藤峡水利枢纽工程一期下闸蓄水移民安置度汛方案
Flood period plan of resettlement for the first stage of water storage of Datengxia Gorge Water Conservancy Project
樊现元1
作者信息
- 1. 广西水利电力勘测设计研究院有限责任公司,南宁 530023
- 折叠
摘要
Abstract
The inundation due to Dtengxia Gorge Water Conservancy Project involves many types and a large number of physical objects.In order to ensure the life and property safety of migrants during flood period,the flood control standard and scope were determined in accordance with relevant specifications;investigation and statistics of physi-cal objects within the flood control area were conducted;the flood period plan of resettlement was drawn up accord-ing to the characteristics of the physical objects influenced by inundation and the progress of the resettlement work,so as to laid a solid foundation for the safety during flood period.关键词
水利工程/淹没区/度汛方案/大藤峡水利枢纽Key words
water conservancy project/inundation area/flood period plan/Datengxia Gorge Water Conservancy Project分类
建筑与水利引用本文复制引用
樊现元..大藤峡水利枢纽工程一期下闸蓄水移民安置度汛方案[J].广西水利水电,2025,(2):111-114,4.