河南水利与南水北调2025,Vol.54Issue(2):51-52,56,3.
临淮岗水文站水位流量关系特性分析
Analysis of the Characteristics of Stage-Discharge Relationship at Linhuaigang Hydrological Station
王天山1
作者信息
- 1. 安徽省六安水文水资源局临淮岗水文站,安徽 六安 237000
- 折叠
摘要
Abstract
In the paper,the water level and discharge data of the Linhuaigang Hydrological Station from 2006 to 2023 are analyzed and the influence of the operaton of hydraulic engineering on the dynamic relationship between water level and discharge are discussed.The findings reveal that the operation of the Linhuaigang Flood Control Project makes the water level of the section change significantly,which are characterized by two distinct phases:2006-2010 and 2011-2023,and the trend of water level fluctuation is different in flood season and non-flood season.Furthermore,through linear trend regression analysis and error calculation,the accuracy of stage-discharge curve is verified.关键词
临淮岗水文站/水位流量关系/水利工程调度/水文监测Key words
Linhuaigang Hydrological Station/stage-discharge relationship/operation of hydraulic engineering/hydrological monitoring分类
水利科学引用本文复制引用
王天山..临淮岗水文站水位流量关系特性分析[J].河南水利与南水北调,2025,54(2):51-52,56,3.