露天采矿技术2025,Vol.40Issue(2):86-89,4.DOI:10.13235/j.cnki.ltcm.20240222
4100XPC电铲推压大花帽卡块改造
4100XPC electric shovel pushing big flower cap card block transformation
高启林 1庞博 1贺栋1
作者信息
- 1. 中煤平朔集团 露天设备维修公司,山西 平鲁 036800
- 折叠
摘要
Abstract
In order to completely solve the problem of 4100XPC electric shovel pushing large cap and bolts failure,the article introduces the working principle of 4100XPC electric shovel pushing large cap card block,and analyzes the existing problems of 4100XPC electric shovel pushing large cap card block,gives the renovation scheme of double clamping block of big flower cap,the locking scheme of double clamping block of big flower cap and the upgrading scheme of double clamping block of big flower cap.The results show that the upgrading effect is remarkable,and the service life of the 4100XPC electric shovel is extended to 1 year,which obtain good economic and social benefits.关键词
4100XPC电铲/推压大花帽/大花帽卡块/卡块固定螺栓/键槽Key words
4100XPC electric shovel/pushing big flower cap/big cap card block/clamping block fixing bolt/keyway分类
矿业与冶金引用本文复制引用
高启林,庞博,贺栋..4100XPC电铲推压大花帽卡块改造[J].露天采矿技术,2025,40(2):86-89,4.