山东煤炭科技2025,Vol.43Issue(4):137-140,146,5.DOI:10.3969/j.issn.1005-2801.2025.04.028
小庄煤矿深部掘进工作面卸压稳控技术研究
Research on Pressure Relief and Stability Control Technology for Deep Excavation Working Faces in Xiaozhuang Coal Mine
朱伟 1王瑞彬1
作者信息
- 1. 陕西彬长小庄矿业有限公司,陕西 咸阳 713500
- 折叠
摘要
Abstract
In view of the problem of rock burst manifestation in the 40208 return air crossheading of Xiaozhuang Coal Mine,method of theoretical analysis is adopted to analyze the main controlling factors of rock burst.The 40208 return air crossheading is evaluated to have moderate rock burst danger,and two strong rock burst danger areas and two moderate rock burst danger areas are divided.Large aperture borehole pressure and blasting pressure relief are adopted in the divided danger areas.Conduct stress monitoring within a range of not less than 200 m behind the head-on of the excavation working face,and the monitoring results show that the pressure relief measures have a good effect.关键词
冲击地压/因素/卸压Key words
rock burst/factor/pressure relief分类
矿山工程引用本文复制引用
朱伟,王瑞彬..小庄煤矿深部掘进工作面卸压稳控技术研究[J].山东煤炭科技,2025,43(4):137-140,146,5.