摘要

Abstract

The cascade reservoirs in the lower Jinsha River were selected as case study.Both the time-varying P-Ⅲ curve fitting(Tv-P3/CF)method and the most likely flood regional composition(MLFRC)method were em-ployed to estimate the design flood during the reservoir operation period,considering the regulation effects of up-stream reservoirs in implicit and explicit way,respectively.The design flood hydrographs were amplified by the same frequency method,and the reservoir flood control water levels(FCWLs)were determined.The results indi-cate that:(1)The design floods during operation period calculated by two methods are consistently lower than those during the construction period.The Tv-P3/CF method offers covariate without the need to consider the reser-voir operation and restore flow data series,while the MLFRC method,which performs step-by-step flood routing from upstream to downstream for each reservoir,is much complex in its calculation process but holds practical sig-nificance.(2)The regulation effect of upper reservoirs significantly reduces downstream floods,1,000-year design flood peak,3-day,7-day,and 15-day flood volumes estimated by the Tv-P3/CF(MLFRC)method have reduced about 37.30%(41.65%),35.96%(39.66%),36.82%(35.72%),and 28.03%(26.76%)at the Xiangjiaba Reservoir,respectively.(3)Maintaining the original flood prevention standards unchanged,the FCWLs derived by flood regulating for the Wudongde-Baihetan-Xiluodu-Xiangjiaba cascade reservoirs are 955.6、794.6、572.3 and 373.2 m,respectively.Compared to reservoir operation based on the flood-limited water levels,the operation of cascade reservoirs based on FCWLs can generate 2.76 billion kW·h more power(+2.6%)from June to September annually,which has significant economic benefits.

关键词

水库运行期/设计洪水/洪水地区组成/非一致性洪水频率分析/汛限水位/汛控水位/金沙江下游

Key words

reservoir operation period/design flood/flood regional composition/non-stationary flood frequency a-nalysis/flood-limited water level/flood control water level/lower Jinsha River

分类

建筑与水利

引用本文复制引用

谢雨祚,郭生练,钟斯睿,汪肖雅,王俊..金沙江下游梯级水库运行期设计洪水计算方法研究[J].水利学报,2025,56(3):354-363,10.

基金项目

国家自然科学基金长江联合基金项目(U2340205) (U2340205)

中国长江电力股份有限公司项目(Z242402005) (Z242402005)

水利学报

OA北大核心

0559-9350

访问量0
|
下载量0
段落导航相关论文