| 注册
首页|期刊导航|云南水力发电|引洮供水二期工程施工重难点及技术要点分析

引洮供水二期工程施工重难点及技术要点分析

杨萍

云南水力发电2025,Vol.41Issue(4):124-127,4.
云南水力发电2025,Vol.41Issue(4):124-127,4.DOI:10.3969/j.issn.1006-3951.2025.04.029

引洮供水二期工程施工重难点及技术要点分析

Analysis of Key Construction Difficulties and Technical Points in the Second Phase of the Tao River Water Supply Project

杨萍1

作者信息

  • 1. 甘肃省水利水电工程局有限责任公司,甘肃 兰州 730000
  • 折叠

摘要

Abstract

The construction management of Tao River Water Supply Phase II Project is an important prerequisite for ensuring its completion,good construction,and long-term benefits.The article combines the actual situation of the 63rd section of the construction project,starting from the content and conditions of the engineering construction,analyzes the key and difficult problems that exist in the construction process,and proposes corresponding solutions.Based on this,it further analyzes and summarizes the construction technology points that need to be done well in the construction process,which has guiding and reference significance for the construction management of this section and the entire Tao River Water Supply Phase II Project.

关键词

引洮供水/二期/重难点/技术要点/分析

Key words

Tao River Water Supply Project/Phase II/key and difficult points/technical key point/analysis

分类

土木建筑

引用本文复制引用

杨萍..引洮供水二期工程施工重难点及技术要点分析[J].云南水力发电,2025,41(4):124-127,4.

云南水力发电

1006-3951

访问量5
|
下载量0
段落导航相关论文