云南水力发电2025,Vol.41Issue(4):179-181,3.DOI:10.3969/j.issn.1006-3951.2025.04.044
境外水电站运行管理风险与应对
Risks and Countermeasures in Operation and Management of Overseas Hydropower Stations
彭承星 1郭鸿鹅 1吕佳军 1王记 1陈庆明1
作者信息
- 1. 瑞丽江一级水电站,云南 昆明 650000
- 折叠
摘要
Abstract
Ruilijiang First level Hydropower Station(referred to as the"Power Station")is the first large-scale hydropower BOT project in China to"go global".Against the backdrop of complex international background,turbulent domestic political situation,slow development of power system,weak grid structure,frequent power grid failures,and lack of overseas operation and management experience of power stations in Myanmar,necessary analysis has been conducted on various internal and external risks during the operation of power stations through continuous exploration and practice,and corresponding measures have been elaborated to address the problems.关键词
境外水电站/运行管理/应对措施Key words
overseas hydropower stations/operation management/countermeasure分类
建筑与水利引用本文复制引用
彭承星,郭鸿鹅,吕佳军,王记,陈庆明..境外水电站运行管理风险与应对[J].云南水力发电,2025,41(4):179-181,3.