滇中引水二期配套工程安全管理的对策及建议
Countermeasures and Suggestions for Safety Management of the Second Phase of Yunnan Central Water Diversion Project
付巡 1王正武 1杨少丹 1黄玉1
作者信息
- 1. 云南省滇中引水工程建设管理局,云南 昆明 650000
- 折叠
摘要
Abstract
Taking the second phase of the Yunnan Central Water Diversion Project as an example,this paper analyzes the current situation and existing problems of construction safety management in water conservancy projects.Based on the actual situation,several countermeasures and suggestions for safety management are elaborated from multiple aspects and perspectives,such as prevention first,system establishment,system improvement,and strengthening supervision.It effectively achieves the goal of sounding the alarm in ideology,strict and effective in system,strong and powerful in technology,strict and meticulous in supervision and management,and serious and serious in handling accidents,and comprehensively strengthens the management of construction production safety.关键词
水利工程/安全管理/对策建议Key words
water conservancy engineering/safety management/countermeasure and suggestion分类
建筑与水利引用本文复制引用
付巡,王正武,杨少丹,黄玉..滇中引水二期配套工程安全管理的对策及建议[J].云南水力发电,2025,41(4):190-194,5.