煤炭与化工2025,Vol.48Issue(4):14-18,5.DOI:10.19286/j.cnki.cci.2025.04.003
采空区未充分垮落结构下回采巷道布置位置研究
Study on the layout position of mining roadway under the structure of insufficient caving in goaf
摘要
Abstract
In order to determine the reasonable layout position of transportation roadway in No.1803 Face of Xinjiang No.106 Mine under the insufficient caving goaf,the actual geological conditions of Xinjiang No.106 Mine was taken as the background,the reasonable layout position of No.1803 transportation was studied by theoretical analysis and numerical simulation.Through theoretical analysis,the vertical stress distribution law under the insufficient caving structure was obtained,and the theoretical range of the reasonable layout of the roadway was obtained.The geological characteristics of Xinjiang No.106 Mine were simulated by numerical software.Based on theoretical analysis,different layout schemes of transportation roadway were simulated.The results showed that the range of 35~45 m from the center of coal pillar in the upper goaf section was a reasonable layout range.In this area,the arrangement of transportation roadway could effectively avoid the high stress area.关键词
未充分垮落结构/巷道布置/近距离煤层/力学模型/数值模拟Key words
incomplete caving structure/roadway layout/close distance coal seam/mechanical model/numerical simulation分类
矿山工程引用本文复制引用
宋虎,张小军,龙颖,刘亚宁,钟建兵..采空区未充分垮落结构下回采巷道布置位置研究[J].煤炭与化工,2025,48(4):14-18,5.基金项目
国家自然科学基金平面基金项目(52204172) (52204172)