基于改进IGA的多品种变批量智能车间调度

刘晋飞 刘乙涵 陈明 黄华

现代制造工程Issue(4):1-10,10.
现代制造工程Issue(4):1-10,10.DOI:10.16731/j.cnki.1671-3133.2025.04.001

基于改进IGA的多品种变批量智能车间调度

Intelligent workshop scheduling with multiple varieties and variable batches based on improved IGA

刘晋飞 1刘乙涵 2陈明 2黄华1

作者信息

  • 1. 同济大学中德工程学院,上海 201804
  • 2. 同济大学机械能源工程学院,上海 201804
  • 折叠

摘要

Abstract

In view of the problem of disconnection between actual production scheduling and theoretical production scheduling due to frequent replacement of tools,fixtures,etc.in high-complexity intelligent manufacturing scenarios with multiple varieties and variable batches,it defines two coefficients,Machine Preparation Duration(MPD)and Machine Processing Coefficient(MPC),constructs an intelligent workshop scheduling mathematical model with multiple varieties and variable batches that introduces MPC parameters and takes minimizing maximum processing machine duration,the total machine load time and the total machine preparation time as the objective functions,designs a new solving algorithm Non-dominated Sorting Immune Genetic Algorithm-Ⅱ(NSIGA-Ⅱ)that combines Non-dominated Sorting Genetic Algorithm-Ⅱ(NGSA-Ⅱ)and Immune Genetic Algorithm(IGA).This algorithm uses a variety of methods for initialization,and proposes a scoring strategy that comprehensively considers non-dominated sorting and the size of the objective function value to select good individuals.At the same time,in order to improve the diversity of the population,it introduces the strategy of population stratification and adaptive cross-mutation.Finally,multiple sets of comparative experiments verify the effectiveness of this algorithm and its advantages of good stability and high solution quality when exploring optimal solutions.

关键词

机器准备时间/非支配排序算法/免疫遗传算法/智能车间调度

Key words

machine preparation duration/NGSA-Ⅱ/immune genetic algorithm/intelligent shop scheduling

分类

计算机与自动化

引用本文复制引用

刘晋飞,刘乙涵,陈明,黄华..基于改进IGA的多品种变批量智能车间调度[J].现代制造工程,2025,(4):1-10,10.