路基工程Issue(2):202-208,7.DOI:10.13379/j.issn.1003-8825.202404004
滨海铁路深厚泥炭土路基DSM桩加固地基病害处理
Research on Disease Treatment of Foundation Reinforced by DSM Piles in Deep Peat Soil Subgrade of Coastal Railway
摘要
Abstract
For problems concerning the subgrade cracking in the treatment of foundation reinforced by DSM piles in deep peat soil subgrade of a coastal railway project in Malaysia,through on-site investigation and supplementary stratigraphic survey,combined with construction monitoring results,theoretical analysis and numerical simulation are used to explore the mechanism of subgrade cracking.The secondary reinforcement measures and treatment scheme are put forward.By increasing the pile length of DSM pile composite foundation in the central area of subgrade to the bottom of soft soil layer,the overall post-construction settlement of foundation can meet the design requirements.关键词
铁路路基/深厚泥炭土/水泥搅拌桩/病害分析/施工监测/二次加固/稳定性Key words
railway subgrade/deep peat soil/cement mixing pile/disease analysis/construction monitoring/secondary reinforcement/stability分类
交通工程引用本文复制引用
冯荣先,金军良,钟钙冰,程文才,叶锡钧..滨海铁路深厚泥炭土路基DSM桩加固地基病害处理[J].路基工程,2025,(2):202-208,7.基金项目
国家自然科学基金项目(51908150) (51908150)