路基工程Issue(2):222-226,5.DOI:10.13379/j.issn.1003-8825.202311040
剥蚀丘陵地带地铁高填方边坡稳定性分析及控制措施
Stability Analysis and Control Measures of Metro High Fill Slope in Denudation Hilly Area
江中勇 1蒋德辉 1郭正伟1
作者信息
- 1. 中铁二十二局集团第五工程有限公司,重庆 400700
- 折叠
摘要
Abstract
Based on the metro high fill slope of Jin'ao Temple Depot in Chongqing,the limit equilibrium method was used to simplify Bishop method,Morgenstern-Price method and midas-GTS finite element software.Considering the influence of slope top load,seism and groundwater level rise in slope,the stability coefficient of high fill slope was analyzed and calculated.The result shows that,the permanent fill slope meets the stability and safety requirements under general working conditions and seismic conditions.However,the rainfall action leads to the increase of the groundwater level in the slope.When the buried depth of the water level in the slope is higher than 7.75 m,the slope stability coefficient will be lower than 1.35,which does not meet the design safety value of the permanent slope.To ensure the safety of the slope,it is necessary to control the groundwater level in the slope by strengthening the drainage in the slope and the water interception outside the slope.关键词
轨道交通/高填方边坡/极限平衡法/水位监测/边坡稳定性Key words
rail traffic/high fill slope/limit equilibrium method/water level monitoring/slope stability分类
建筑与水利引用本文复制引用
江中勇,蒋德辉,郭正伟..剥蚀丘陵地带地铁高填方边坡稳定性分析及控制措施[J].路基工程,2025,(2):222-226,5.