科技创新与应用2025,Vol.15Issue(12):139-142,146,5.DOI:10.19981/j.CN23-1581/G3.2025.12.032
42 号道岔接触网关节式电分段布置方式探讨
宋军辉 1李茂才 1郑鹏 1王先铎1
作者信息
- 1. 中铁电气化局集团第一工程有限公司,北京 100070
- 折叠
摘要
Abstract
By drawing on the non-crossing arrangement form of No.42 turnout in the Hangzhou-Huangshan Railway Tunnel,this paper analyzes the similarities and differences of the designed non-crossing arrangement form of No.42 turnout contact network at Houmazhuang Station on the Xu-Su-Huai-Yan Railway,and proposes an arrangement and adjustment plan for the articulated electrical section of No.42 turnout contact network at the hard horizontal beam of the newly built line,providing reference for the arrangement and adjustment of non-crossing crossings at the hard beam of the newly built line.关键词
硬横梁/42 号道岔/关节式电分段/接触网/布置形式Key words
hard horizontal beam/No.42 turnout/articulated electrical segmentation/catenary/layout form分类
交通工程引用本文复制引用
宋军辉,李茂才,郑鹏,王先铎..42 号道岔接触网关节式电分段布置方式探讨[J].科技创新与应用,2025,15(12):139-142,146,5.