摘要
Abstract
With the acceleration of urbanization in China,waterworks are important infrastructure for urban water supply,and their stable operation and water quality safety are crucial.As the core treatment unit of the waterworks,the horizontal sedimentation tank has a direct impact on the water quality and operating costs.Traditional mud-discharging truss trucks are prone to problems such as truss corrosion,overall deformation,reducer failure,uneven track and mud accumulation at the mud suction port during long-term operation,which seriously restricts the operating efficiency and water quality safety of the sedimentation tank.In response to the above problems,this paper proposes a renovation plan based on a siphon type mud discharge truss truck.Based on the actual case of a water plant in Shenzhen,the implementation process,innovative technology application and results of the renovation plan are described in detail.The transformed mud discharge truss truck operates stably and discharges mud smoothly,effectively improving the operating efficiency and water quality safety of the sedimentation tank,and providing valuable experience reference for the same industry.关键词
平流沉淀池/排泥桁车/虹吸式排泥/池壁自动清洗刷/夹轨装置Key words
advection sedimentation tank/sludge discharge truck/siphon sludge discharge/automatic tank wall cleaning brush/rail clamping device分类
建筑与水利