| 注册
首页|期刊导航|四川水力发电|巴拉水电站高压并联电抗器选择与应用

巴拉水电站高压并联电抗器选择与应用

周晓航

四川水力发电2025,Vol.44Issue(2):81-85,5.
四川水力发电2025,Vol.44Issue(2):81-85,5.DOI:10.20196/j.cnki.scslfd.20250220

巴拉水电站高压并联电抗器选择与应用

Selection and Application of High-Voltage Parallel Reactor for Bala Hydropower Project

周晓航1

作者信息

  • 1. 阿坝水电开发有限公司,四川 阿坝 624000
  • 折叠

摘要

Abstract

With the continuous expansion of power grid system,the voltage level is constantly improving.As an important power equipment,reactors play an important role in limiting short-circuit currents in the power grid,compensating reactive power in the system,and improving the stability of the transmission system.This article explores and analyzes the selection of high-voltage parallel reactors for the Bala Hydropower Project,which is of great significance for the safe,reliable,and stable operation of the Bala Hydropower Project.

关键词

电抗器/无功补偿/自励磁/工频过电压

Key words

Reactor/Reactive power compensation/Self-Excitation/Power frequency overvoltage

分类

信息技术与安全科学

引用本文复制引用

周晓航..巴拉水电站高压并联电抗器选择与应用[J].四川水力发电,2025,44(2):81-85,5.

四川水力发电

1001-2184

访问量0
|
下载量0
段落导航相关论文