水电工程移民安置验收要点分析及方法探索

刘应军

四川水力发电2025,Vol.44Issue(2):149-152,4.
四川水力发电2025,Vol.44Issue(2):149-152,4.DOI:10.20196/j.cnki.scslfd.20250235

水电工程移民安置验收要点分析及方法探索

Analysis on Key Points and Exploration of Methods for Resettlement Acceptance in Hydropower Projects

刘应军1

作者信息

  • 1. 四川小金川水电开发有限公司,四川 阿坝 624200
  • 折叠

摘要

Abstract

The article analyzes the adjustment of resettlement planning and the key points of completion accept-ance for water conservancy and hydropower projects under new circumstances.It explores solutions to the problems encountered during the adjustment of planning and the completion acceptance process,aiming to pro-vide references for standardizing the adjustment of resettlement planning and the completion acceptance of re-settlement work under new conditions.The discussion is conducted from two perspectives:the adjustment of resettlement planning and the key points of resettlement completion acceptance.By incorporating the case study of the resettlement planning adjustment and completion acceptance of the Yangjiawan Hydropower Pro-ject,the article investigates and analyzes potential solutions.The study finds that detailed physical indicator surveys,rigorous resettlement planning,standardized implementation of resettlement,and a well-established management system for resettlement completion acceptance are crucial for the successful completion of reset-tlement in water conservancy and hydropower projects.

关键词

水利水电工程/移民安置规划/竣工验收/方法探索

Key words

Water conservancy and hydropower projects/Resettlement planning/Completion acceptance/Method exploration