设备监理Issue(2):18-21,25,5.DOI:10.19919/j.issn.2095-2465.2025.04.005
175MPa特高压防喷器组监理作业流程分解与实践
Analysis and Practice of the Supervision Process of the 175 MPa Ultra-high-pressure BOP Stack
孙洪祥 1魏军会 2谢俊峰 2王鹏程 2熊垒3
作者信息
- 1. 中国石油集团川庆钻探工程有限公司安全环保质量监督检测研究院 德阳 618300
- 2. 中国石油天然气股份有限公司塔里木油田分公司 库尔勒 841000
- 3. 四川科特检测技术有限公司 德阳 618300
- 折叠
摘要
Abstract
The 175 MPa ultra-high pressure blowout preventer(BOP)assembly is developed to meet the urgent needs of national oil and gas field exploration and development in ultra-deep wells over 10 000 meters and ultra-high pressure reservoirs.It represents the highest pressure rating and the most advanced design in well control equipment both domestically and internationally.As a non-standard product,its design,manufacturing,verification,and application differ significantly from conventional products,making quality control particularly crucial to ensure the overall performance of the equipment.To guarantee quality,the supervision agency has divided the supervision process for the 175 MPa ultra-high pressure BOP assembly into detailed stages,with each phase of supervision work meticulously broken down and explained.This approach has achieved effective supervision results,providing valuable insights for supervision agencies in managing 175 MPa ultra-high pressure equipment.关键词
万米深井/防喷器/监理Key words
10000-meter-deep well/Blowout preventer/Supervision引用本文复制引用