铁路通信信号工程技术2025,Vol.22Issue(4):45-50,6.DOI:10.3969/j.issn.1673-4440.2025.04.007
兰州西动车所股道分割方案优化设计
Optimization Design of Track Segmentation Scheme of Lanzhou West EMU Depot
尚方宁1
作者信息
- 1. 中国铁路兰州局集团有限公司兰州高铁基础设施段,兰州 730050
- 折叠
摘要
Abstract
In order to address the inefficiency in the entry and exit processes of MU trains in Lanzhou West EMU Depot,the track segmentation scheme of the depot is optimized based on the analysis of its existing operation modes.Additionally,a safety protection scheme for MU train operations has been implemented to ensure that the long(and short)MU trains can stop in the segmented track section on the first attempt.This design meets the transportation requirements of MU trains,and provides reference for the transformation of the same type of EMU depots.关键词
动车所/股道分割/调车作业优化/安全防护/电码化技术Key words
EMU depot/track segmentation/optimization of shunting operation/safety protection/coding technology分类
交通运输引用本文复制引用
尚方宁..兰州西动车所股道分割方案优化设计[J].铁路通信信号工程技术,2025,22(4):45-50,6.