江苏水利Issue(5):27-32,6.
驷马山分洪道乌江枢纽流态和分流比优化
Optimization of the flow pattern and discharge division ratio of the Wujiang Hub in the Simashan flood diversion channel
戚庆军 1戴宜高 2贲鹏3
作者信息
- 1. 安徽省驷马山引江工程管理处,安徽 马鞍山 238251
- 2. 江苏省骆运水利工程管理处,江苏 宿迁 223800
- 3. 安徽省(淮河水利委员会)水利科学研究院,安徽 合肥 230088
- 折叠
摘要
Abstract
Based on typical years of measured data,the relationship between the diversion of floods at the Xin Gate and the Wujiang Gate,the flow pattern and velocity distribution on the Xin Gate,and the drop height between the Xin Gate and the Wujiang Gate were analyzed.The reasons for the insufficient backflow and diversion ratio in the upper reaches of the Xin Gate were explored.A hydrodynamic mathematical model coupling hub and river channel was constructed,and the model was validated using cross-sectional velocity distribution and measured diversion comparison.The flow conditions of the current situation and engineering combination conditions were simulated.The results show that the combination scheme of a 6-meter elevation of the left bank cut-off bottom and dredging below the Xin Gate can basically eliminate the adverse flow pattern on the Xin Gate and improve the discharge diversion ratio of the Xin Gate.关键词
驷马山分洪道/乌江枢纽/分流比/数学模型Key words
Simashan flood diversion channel/Wujiang Hub/discharge division ratio/mathematical model分类
建筑与水利引用本文复制引用
戚庆军,戴宜高,贲鹏..驷马山分洪道乌江枢纽流态和分流比优化[J].江苏水利,2025,(5):27-32,6.