强潮急流跨海桥梁基础局部冲刷研究

李有为 肖苡辀

水资源与水工程学报2025,Vol.36Issue(2):84-92,9.
水资源与水工程学报2025,Vol.36Issue(2):84-92,9.DOI:10.11705/j.issn.1672-643X.2025.02.10

强潮急流跨海桥梁基础局部冲刷研究

Investigation on local scour of a sea-crossing bridge foundation under strong tidal waves and torrents

李有为 1肖苡辀1

作者信息

  • 1. 中交第二航务工程局有限公司,湖北 武汉 430040||中交二航局第四工程有限公司,安徽 芜湖 241000||交通运输行业交通基础设施智能制造技术研发中心,湖北 武汉 430040||长大桥梁建设施工技术交通行业重点实验室,湖北 武汉 430040||中交公路长大桥建设国家工程研究中心有限公司,湖北 武汉 430040
  • 折叠

摘要

Abstract

The causes of foundation scour of sea-crossing bridges are complicated.To prevent water dam-age,it is critical to investigate the local scour situation these bridges face at different construction stages.Taking the main pile foundation of Hangzhou Bay Railway Bridge(under construction)as the case study,we investigated the scour features and hydraulic characteristics of the bridge during different foundation construction stages by physical model test,numerical simulation and in-situ measurements.The results show that the model test and numerical simulation results are consistent with the measured data.During the pile foundation construction stage,the tidal waves and torrents have scoured the sandy layer off,left the bridge site surface with a muddy clay layer,which is more difficult to be soured off.70%of the scour depth occurs in the first 30%of the scour duration.The cofferdam can reduce the relative variation range of shear stress on the bed surface and the surrounding flow velocity,resulting in the formation of a silting area on both the stoss and lee side.After the cofferdam is lowered,the scour depth will continue to grow another 4 m,which can further increase the scour depth and scope by about 30%,exceeding the de-signed scour depth of pile foundation.Therefore,countermeasures should be considered for scour preven-tion and foundation protection.The research results can provide a reference for the design,construction and operation management of similar sea-crossing bridges.

关键词

强潮急流/跨海桥梁基础/局部冲刷/物理模型/数值模拟/原位实测

Key words

strong tidal wave and current/foundation of the sea-crossing bridge/local scour/physical model/numerical simulation/in-situ measurement

分类

交通运输

引用本文复制引用

李有为,肖苡辀..强潮急流跨海桥梁基础局部冲刷研究[J].水资源与水工程学报,2025,36(2):84-92,9.