摘要
Abstract
The implementation phase of the project is an important process for achieving design objectives,and project quality is the foundation for the sustainability of project benefits.The construction process requires coordination and coordination of multiple professionals and resources in terms of quality,investment,and progress,in order to achieve the design intent as much as possible,at the same time,construction experience should be used to check and fill in the gaps in the design content,so as to present the optimal state of the project results.The Huaifang Reclaimed Water Plant Wetland Ecological Park is the first design attempt in China to integrate rooftop wetland landscape with large-scale underground reclaimed water infrastructure.Taking the wetland park renovation as an example,analyze the problems that exist during the implementation of the project,and formulate countermeasures from the perspectives of design,construction and later maintenance.Overall,it is necessary to strengthen specialized maintenance management,comprehensively consider the purification mechanisms of plants,microorganisms,and substrates in wetlands for water quality,and enhance the sustainability of engineering ecological functions and benefits.关键词
小型人工湿地/工程实施/生态功能/可持续性Key words
small-scale artificial wetland/project implementation/ecological function/sustainability分类
资源环境