摘要
Abstract
Gas power generation projects use internal combustion engines to generate waste heat,if it is only used for heating,the energy utilization rate will be low,especially in the summer when heat demand is low.In order to improve the efficiency of waste heat utilization in gas power generation,the combination of quick installation steam turbine generator units are applied to waste heat power generation projects,based on the current development status of steam turbine condensing systems,the project's waste heat utilization plan is explored,and the economic benefits,energy-saving and emission reduction effects,social benefits and safety benefits are analyzed.The results show that the new process of using a combination of air cooling and evaporative cooling in steam turbines meets the requirements of national energy-saving policies,effectively improves energy utilization efficiency,and reduces operating costs for enterprises.关键词
余热发电/汽轮发电机组/复合式凝汽器/组合快装Key words
waste heat power generation/steam turbine generator set/composite condenser/combination quick install分类
信息技术与安全科学