东北电力技术2025,Vol.46Issue(5):54-57,4.
变电站220 kV线路接地线操作安全与效率提升研究
Research on Safety and Efficiency Improving of 220 kV Line Grounding Wire Operation in Substation
段辞涵 1刘权莹 2张志义 1孟庆凯 1潘雄1
作者信息
- 1. 广东电网有限责任公司广州供电局,广东 广州 510620
- 2. 国网辽宁省电力有限公司电力科学研究院,辽宁 沈阳 110006
- 折叠
摘要
Abstract
The ground height of 220 kV line hanging and dismantling grounding wire in traditional substation is about 7 meters from the ground.It is high in the working place,difficult in operation,and high in personal and equipment safety risks.Therefore,it propo-ses an integrated mobile work platform for hanging and dismantling grounding wire.Based on the analysis of the practical problems ex-isting in the traditional grounding wire operation grounding,the traditional working tools and instruments are improved from three as-pects of safety,convenience and stability.Combined with the actual scene operation,it verifies the feasibility and advancement of the operation platform.Compared with the traditional insulation climbing tool,it can make the operators can carry out the hanging and dis-mantling grounding wire operation in a relatively safe and stable environment,and reduce the risk of personnel falling and equipment damage caused by unstable standing and insufficient power.关键词
接地线操作/绝缘登高工具/移动作业平台Key words
grounding wire operation/insulation climbing tool/mobile work platform分类
动力与电气工程引用本文复制引用
段辞涵,刘权莹,张志义,孟庆凯,潘雄..变电站220 kV线路接地线操作安全与效率提升研究[J].东北电力技术,2025,46(5):54-57,4.