| 注册
首页|期刊导航|电力系统自动化|兼顾公平与效率的聚合多元灵活资源虚拟电厂协同规划

兼顾公平与效率的聚合多元灵活资源虚拟电厂协同规划

梁博淼 杨甲甲 文福拴 王力成 董朝阳 侯北平

电力系统自动化2025,Vol.49Issue(10):67-76,10.
电力系统自动化2025,Vol.49Issue(10):67-76,10.DOI:10.7500/AEPS20240729004

兼顾公平与效率的聚合多元灵活资源虚拟电厂协同规划

Collaborative Planning of Virtual Power Plants Aggregating Multivariate and Flexible Resources and Balancing Fairness and Efficiency

梁博淼 1杨甲甲 2文福拴 3王力成 4董朝阳 5侯北平1

作者信息

  • 1. 浙江科技大学自动化与电气工程学院,浙江省 杭州市 310023
  • 2. 詹姆斯库克大学科学与工程学院,澳大利亚汤斯维尔市 QLD 4811
  • 3. 浙江大学电气工程学院,浙江省 杭州市 310007
  • 4. 浙江工业大学信息工程学院,浙江省 杭州市 310023
  • 5. 香港城市大学电机工程学系,香港 999077
  • 折叠

摘要

Abstract

Under the the goal of carbon emission peak and carbon neutrality,the function of virtual power plant(VPP)in aggregating massive and diverse distributed flexible resources is becoming increasingly prominent.Clarifying the business model,key issues,and target demands of VPP is conducive to the potential exploration of flexible resources and VPP and the low-carbon and zero-carbon construction of the new power system.Meanwhile,concerns about fairness at the social level are also strengthening.Energy fairness is related to basic production and life.Moreover,as the operation of flexible resources may involve different participants,the demand for fairness in VPP planning and scheduling is even more intense compared with traditional scenarios.Therefore,this paper introduces fairness measurement standards in the VPP planning and proposes aggregation,invocation,and benefit distribution schemes considering fairness and efficiency.Firstly,considering the VPP market interaction and the contracted scheduling of distributed energy resources(DERs)comprehensively,a medium and long-term scheduling revenue model for DER and VPP is established.Next,the VPP combinatorial optimization under uncertain risks and the collaborative optimization of DER decisions with fairness concerns are carried out,and they are solved with the help of a two-stage optimization model based on the idea of signing first and then scheduling.Then,the optimization of the DER renewal rate and the influence of the regional capacity load limit are explored.Finally,from the analysis of specific calculation cases and data results,it is concluded that the compression of the revenue space of VPP by fairness concerns is actually rather limited.However,it is necessary to establish reasonable market-based pricing for flexible resources such as battery energy storage system and interruptible loads to avoid vicious competition and investment waste.

关键词

虚拟电厂/灵活资源/需求侧响应/公平/效率/两阶段优化

Key words

virtual power plant/flexible resource/demand response/fairness/efficiency/two-stage optimization

引用本文复制引用

梁博淼,杨甲甲,文福拴,王力成,董朝阳,侯北平..兼顾公平与效率的聚合多元灵活资源虚拟电厂协同规划[J].电力系统自动化,2025,49(10):67-76,10.

基金项目

浙江科技大学基本科研业务费资助项目(2023QN043) (2023QN043)

国家自然科学基金资助项目(52007170). This work is supported by Fundamental Research Funds for Zhejiang University of Science&Technology(No.2023QN043)and National Natural Science Foundation of China(No.52007170). (52007170)

电力系统自动化

OA北大核心

1000-1026

访问量0
|
下载量0
段落导航相关论文