大坝安全稳定性校核及加固方案对比分析
Comparison and Analysis of Dam Safety and Stability Verification and Reinforcement Plans
柴灏1
作者信息
- 1. 六安市正天水利勘测设计有限公司,安徽 六安 237000
- 折叠
摘要
Abstract
The stability verification and reinforcement plan during the service period of a dam are the key factors in evaluating and ensuring the safe operation of the dam.Combined with engineering examples,the calculation methods and verification indicators of dam flood control capacity,stress assessment,and anti sliding stability were discussed.The superelevation of the dam crest was mainly determined by wave height,water level difference,and safety elevation.The extreme stress was mainly determined by the tensile strength of the dam material,and the anti sliding stability was mainly determined by the weight of the dam body and the shear friction coefficient.And a multi-dimensional comparative analysis was conducted on three types of dam reinforcement schemes:demolition and reconstruction of arch dams,renovation of solid gravity dams,and renovation of existing arch dams.The results showed that the renovation of arch dam reinforcement scheme had a higher comprehensive cost-effectiveness in terms of economy and construction difficulty.This construction scheme can be used as a choice for dam reinforcement similar projects.关键词
稳定性校核/加固方案/水利工程Key words
stability verification/reinforcement plan/water conservancy engineering分类
建筑与水利引用本文复制引用
柴灏..大坝安全稳定性校核及加固方案对比分析[J].海河水利,2025,(5):41-44,4.