| 注册
首页|期刊导航|江西建材|滇中引水香炉山隧道地质问题研究进展

滇中引水香炉山隧道地质问题研究进展

许汉华

江西建材Issue(3):9-12,4.
江西建材Issue(3):9-12,4.

滇中引水香炉山隧道地质问题研究进展

Research Progress on Geological Issues of Xianglushan Tunnel in the Water Diversion Project in Central Yunnan

许汉华1

作者信息

  • 1. 中国有色金属工业昆明勘察设计研究院有限公司,云南 昆明 650051||云南省岩土工程与地质灾害重点实验室,云南 昆明 650051
  • 折叠

摘要

Abstract

The Xianglushan Tunnel,a critical component of the Central Yunnan Water Diversion Project,is an ultra-long and deep-buried tunnel situated under world-class complex geological conditions.It faces multiple extreme geological challenges,including karst water inrush,large deformation of soft rock under high ground stress,and active fault zones.This study focuses on the identification of geological risks,inno-vation in construction technologies,and verification through engineering practices,integrating multidisciplinary approaches to form a systematic solution.The research outcomes provide a replicable theoretical framework and technical paradigm for similar deep-buried long tunnels global-ly,thereby promoting the intelligent and green development of water conservancy projects in China.Future research should deepen the under-standing of intelligent construction methods,the mechanisms of ground stress evolution,and low-carbon construction technologies to address the remaining complex geological challenges.

关键词

香炉山隧道/岩溶突涌水突泥/高地应力软岩变形/TBM施工技术/地质超前预报体系

Key words

Xianglu mountain tunnel/Karst water gushing/High ground stress soft rock deformation/TBM construction technology/Geological advance prediction system

分类

交通运输

引用本文复制引用

许汉华..滇中引水香炉山隧道地质问题研究进展[J].江西建材,2025,(3):9-12,4.

江西建材

1006-2890

访问量0
|
下载量0
段落导航相关论文