| 注册
首页|期刊导航|江西建材|地铁车站地下连续墙对建筑物沉降的影响研究

地铁车站地下连续墙对建筑物沉降的影响研究

白洋

江西建材Issue(3):188-190,3.
江西建材Issue(3):188-190,3.

地铁车站地下连续墙对建筑物沉降的影响研究

Study on the Influence of Underground Diaphragm Wall on Building Settlement in Subway Station

白洋1

作者信息

  • 1. 山西省光信地产投资集团有限公司,山西 太原 030006
  • 折叠

摘要

Abstract

In order to analyze the variation rule of building settlement after the construction of underground continuous wall,PLAXIS simulation software was used to analyze the long-term settlement deformation of houses,and a long-term prediction model of house settlement was pro-posed.The results show that the underground diaphragm wall has a lag effect on the settlement of surrounding buildings.With the increase of time,the settlement of the building continues to increase,and the settlement of the building tends to be stable after one year of construction.The closer the distance from the diaphragm wall,the greater the settlement value of the building,and the decreasing rate decreases gradually with the distance from the diaphragm wall.When predicting the long-term settlement of houses in soft soil area,the modified hyperbola model should be preferred,and its accuracy is more than 0.995.

关键词

基坑工程/地下连续墙/邻近房屋建筑/沉降监测/数值模拟

Key words

Foundation pit engineering/Underground diaphragm wall/Adjacent building construction/Settlement monitoring/Numerical sim-ulation

分类

建筑与水利

引用本文复制引用

白洋..地铁车站地下连续墙对建筑物沉降的影响研究[J].江西建材,2025,(3):188-190,3.

江西建材

1006-2890

访问量0
|
下载量0
段落导航相关论文