In view of the actual situation that a septic tank is needed to be set up in the narrow scope of the outdoor sewage pipe reconstruction,combined with the site conditions on both sides of the excavation foundation pit,the support scheme of the foundation pit slope and the monito-ring method of the excavation are studied and determined,and the construction method of the installation of the septic tank and the earthwork backfilling is clarified.The results show that the construction method can ensure the safety of the original buildings on both sides of the founda-tion pit of the septic tank,and the reformed outdoor sewage pipe system can fully meet the needs of sewage discharge function.关键词
化粪池/基坑/支护/施工方法Key words
Septic tank/Excavation pit/Support/Construction methods分类
建筑与水利引用本文复制引用
林立..既有校区内化粪池改造工程施工方法研究[J].江西建材,2025,(3):247-248,252,3.基金项目
中国智慧工程研究会"十四五"规划重点课题《绿色节能环境下建筑工程技术的改良》(项目编号:GCKT85691). (项目编号:GCKT85691)