高速铁路增建车站通信传输接入优化研究

罗诗慧

铁路通信信号工程技术2025,Vol.22Issue(5):61-65,72,6.
铁路通信信号工程技术2025,Vol.22Issue(5):61-65,72,6.DOI:10.3969/j.issn.1673-4440.2025.05.010

高速铁路增建车站通信传输接入优化研究

Research on Optimization of Communication Transmission Access of Newly Added High Speed Railway Stations

罗诗慧1

作者信息

  • 1. 中铁二院工程集团有限责任公司,成都 610031
  • 折叠

摘要

Abstract

This paper applies the system engineering approach and combines the case analysis method,based on the newly added station project of Hainan Western Ring High-Speed Railway,and analyzes the critical technology of access commissioning of communication transmission equipment.By constructing the transmission network reliability model,it quantitatively analyzes the impacts of different access methods on system performance,and proposes the optimized commissioning scheme of"stepwise access and multi-phase verification".The practice shows that this solution reduces the transmission interruption duration by 40%,and improves the service recovery time by 55%,significantly enhancing the stability and reliability of the communication system.The findings provide a scientifically validated access scheme for the communication engineering in high speed railway newly added station projects.

关键词

高速铁路/增建车站/通信传输设备/接入调试

Key words

high speed railway/newly added station/communication transmission equipment/access commissioning

分类

交通工程

引用本文复制引用

罗诗慧..高速铁路增建车站通信传输接入优化研究[J].铁路通信信号工程技术,2025,22(5):61-65,72,6.

基金项目

中国国家铁路集团有限公司系统性重大项目(2022YJ215) (2022YJ215)

四川省重大科技专项(2023ZDZX0008) (2023ZDZX0008)

铁路通信信号工程技术

1673-4440

访问量0
|
下载量0
段落导航相关论文