摘要
Abstract
For a long time,the municipal drainage facilities in Zhongshan City have adopted a management model of"city,town and street+factory,network division+rain and pollution division",which has problems such as multiple operation and management entities of drainage facilities,inconsistent overall construction,and difficult synchronization of coordinated operation.Based on a comprehensive analysis of the current situation of drainage facilities in Zhongshan City and with reference to other surrounding cities,this article proposes a direction for exploring the reform of"implementing factory network integration",changing the previous model of"separate treatment,treating the head when the symptoms arise,and treating the foot when the symptoms arise".Through unified management and scientific scheduling of drainage facilities,the operational efficiency of the drainage system and the level of water environment management in the basin are improved,achieving full collection and treatment of sewage in Zhongshan and promoting continuous improvement of water ecological environment quality.关键词
排水设施/现状分析/厂网一体化Key words
drainage facility/current situation analysis/factory network integration分类
建筑与水利