云南水力发电2025,Vol.41Issue(5):119-123,157,6.DOI:10.3969/j.issn.1006-3951.2025.05.029
城市轨道地下交通接驳通道防洪设防水位分析
Analysis of Flood Control Water Level for Urban Rail Transit Connection Channels
李成山1
作者信息
- 1. 深圳市水务规划设计院股份有限公司,广东 深圳 518000
- 折叠
摘要
Abstract
In recent years,the frequency and intensity of extreme rainstorm weather show an increasing trend,and flood disasters occur frequently in various places.The construction of urban rail transit and its connected properties in Shenzhen has been increasing year by year,and there is a risk of flooding at ground entrances and exits,making the situation of flood prevention and control severe.This paper takes the flood control analysis and evaluation of the connecting passage between a property in Longgang District and Apollo Station of Metro Line 16 Phase Ⅱ as an example.It uses the Mike Urban module to construct a drainage network model and the Mke21 module to construct a two-dimensional surface model.Finally,the model was coupled on the Mike FLood platform to form a complete flood analysis model,simulating the 100 year flood water level around the project,providing a scientific basis for the design of the floor elevation and flood control measures of the subway and connected property exits.关键词
轨道交通/洪涝分析/洪水模拟/防洪评价Key words
rail transit/flood analysis/flood simulation/flood control evaluation分类
建筑与水利引用本文复制引用
李成山..城市轨道地下交通接驳通道防洪设防水位分析[J].云南水力发电,2025,41(5):119-123,157,6.