云南水力发电2025,Vol.41Issue(5):124-127,4.DOI:10.3969/j.issn.1006-3951.2025.05.030
小隐涌流域活水循环治理改造工程技术研究
Research on the Technology of Active Water Circulation Treatment and Renovation Project in Xiaoyinchong Basin
高进宝1
作者信息
- 1. 中山市堤围管理中心,广东 中山 528499
- 折叠
摘要
Abstract
Taking Xiaoyinchong River Basin Active Water Cycle Project in Zhongshan City as the research background,in response to the serious"black and odorous"situation,poor hydrodynamic conditions,and ecological environment damage in the river,the active water cycle treatment and transformation will be carried out in different areas.In response to the serious problem of water source pollution in the western area,measures have been taken to build a new pump station with a water replenishment capacity of 20m3/d to increase the ecological water volume of the rivers in the western area,reduce the concentration of water pollutants,and improve the water quality of the rivers in the basin.In response to the poor hydrodynamic conditions in the central and western regions,scientific linkage of water gates is adopted to form a connected water system,increase the ecological environment capacity of river channels,and improve the hydrodynamics of river channels.关键词
小隐涌流域/活水循环/生态环境/水动力Key words
Xiaoyinchong Basin/active water cycle/ecological environment/hydrodynamic force分类
建筑与水利引用本文复制引用
高进宝..小隐涌流域活水循环治理改造工程技术研究[J].云南水力发电,2025,41(5):124-127,4.