龙门涝区排涝提升下的泵站扩建优化研究
Research on the Optimization of Pump Station Expansion under the Improvement of Drainage in Longmen Flood prone Area
黄圳钦1
作者信息
- 1. 普宁市水利工程管理服务中心,广东 普宁 515300
- 折叠
摘要
Abstract
Lianjiang flood disasters occur frequently,and the drainage facilities planned in the early stages of Longmen flood area have insufficient drainage capacity.According to the scale of Longmen flood and irrigation,they are scientifically divided into high discharge area(self discharge area)and low discharge area.Three pump stations will be rebuilt and planned on the original site:Longnei Pump Station,Longmen Pump Station,and Linne Pump Station.Two types of pump stations will be selected:embankment pump station and embankment pump station.The scale of the pump station,the layout of the main buildings,and the selection of pump station units have been determined.Reasonable water level observation and settlement observation have been formulated,and an optimized scheduling irrigation plan has been proposed after completion.关键词
涝区治理/泵站扩建/排涝提升/防洪治涝Key words
management of flood area/pump station expansion/improvement of drainage system/flood control and waterlogging prevention分类
水利科学引用本文复制引用
黄圳钦..龙门涝区排涝提升下的泵站扩建优化研究[J].云南水力发电,2025,41(5):175-178,4.