云南水力发电2025,Vol.41Issue(5):193-196,4.DOI:10.3969/j.issn.1006-3951.2025.05.046
对七一水库除险加固建设方案的几点思考
Several Thoughts on the Construction Plan for Risk Elimination and Reinforcement of Qiyi Reservoir
摘要
Abstract
To solve the problems of missing slope surface,insufficient dam height,severe siltation in the reservoir area,dam leakage,and channel damage in the Qiyi Reservoir,this paper explores the risk elimination and reinforcement plan.The article analyzes the construction of reservoirs,previous renovations,and existing problems,and proposes engineering measures and specific reinforcement plans for reservoir risk elimination and reinforcement.Based on this,several thoughts and suggestions are put forward from the aspects of engineering geology,lead wire gabion design,structural calculation,construction organization,engineering management,and information technology construction.关键词
七一水库/除险加固/存在的问题/工程措施/思考Key words
Qiyi Reservoir/risk elimination and reinforcement/existing problem/engineering measure/thought分类
水利科学引用本文复制引用
张明明..对七一水库除险加固建设方案的几点思考[J].云南水力发电,2025,41(5):193-196,4.基金项目
国家自然科学基金项目(52208392) (52208392)