| 注册
首页|期刊导航|港口航道与近海工程|斜向靠泊风险对高桩码头的影响分析

斜向靠泊风险对高桩码头的影响分析

凌授珺 孙克俐

港口航道与近海工程2025,Vol.62Issue(3):40-44,5.
港口航道与近海工程2025,Vol.62Issue(3):40-44,5.DOI:10.16403/j.cnki.ggjs20250310

斜向靠泊风险对高桩码头的影响分析

Analysis for Influence of Diagonal Berthing Risks on Piled Wharf

凌授珺 1孙克俐2

作者信息

  • 1. 中交第一航务工程勘察设计院有限公司,天津 300220||天津市海岸与近海工程岩土与结构重点实验室,天津 300222
  • 2. 天津大学建筑工程学院,天津 300072
  • 折叠

摘要

Abstract

The extensive mode and inaccuracy of codes are regarded as high potential risks in the design.The investigation results show that the calculation method of ship impact force specified in Chinese standards cannot fully reflect real berthing state of a ship.Based on the platform in front of a small piled wharf along Zhujiang River,a finite element analysis software ANSYS was used to study the displacement of a structure under the diagonal impact force by a ship and the stress acting on a pile foundation.The internal force and displacement of the pile foundation calculated by using different specifications were compared,which led to the risk control measures from the aspect of design.

关键词

有限元分析/船舶撞击力/高桩码头/风险控制

Key words

finite element analysis/impact force by a ship/piled wharf/risk control

分类

交通运输

引用本文复制引用

凌授珺,孙克俐..斜向靠泊风险对高桩码头的影响分析[J].港口航道与近海工程,2025,62(3):40-44,5.

港口航道与近海工程

1004-9592

访问量0
|
下载量0
段落导航相关论文