一种高桩墩式码头装配式墩台结构及其施工方法

柴广智

港口航道与近海工程2025,Vol.62Issue(3):95-98,4.
港口航道与近海工程2025,Vol.62Issue(3):95-98,4.DOI:10.16403/j.cnki.ggjs20250322

一种高桩墩式码头装配式墩台结构及其施工方法

One Assembly Platform of Piled Pier Dock and Corresponding Construction Method

柴广智1

作者信息

  • 1. 中交第一航务工程勘察设计院有限公司,天津 300220
  • 折叠

摘要

Abstract

In order to improve the construction efficiency and reliability of projects,a new assembly pier structure was proposed,including its construction method in detail in view of the existing problems in the conventional construction of cast-in-situ pier such as a complex construction process,high direct/indirect cost and etc in the construction field of piled pier docks.The advantages of assembly structure and cast-in-place structure were integrated into a set of innovated assembly pier structures,which produced innovative ideas and provided technical support for port construction.

关键词

高桩墩式码头/装配式墩台结构/施工方法/大体积混凝土/薄壁钢筋混凝土结构

Key words

piled pier dock/assembly pier structure/construction method/mass concrete/thin-walled RC structure