煤炭与化工2025,Vol.48Issue(5):32-37,45,7.DOI:10.19286/j.cnki.cci.2025.05.007
深部高应力回采巷道破坏机理与支护方案优化
Failure mechanism and support scheme optimization of deep high stress mining roadway
摘要
Abstract
Roadway support is the core of safe and stable deep high stress mining tunnels.In response to the unclear failure mechanism and difficulty of support in the deep high stress mining roadway of Jiulong Mine in Fengfeng Mining Area,this paper analyzed the process and mechanism of rock failure in the high stress mining roadway,proposed a deep mining roadway anchor bolt support technology scheme,compared and analyzed different support schemes through numerical simulation,and carried out on-site application of roadway anchor net cable joint support.The results showed that different support schemes had different control effects on the surrounding rock of the roadway.According to the ranking of rock control effects from good to poor,they were as follows:full anchor support(row spacing of 0.8m),full anchor support(row spacing of 1.2m),alternating mixed support of one row of anchor cables and anchor rod intervals,full anchor rods,and alternating support of one row of anchor cables and one row of anchor rods.This study provided a scientific basis for understanding the failure characteristics of high stress mining roadways in coal mines and optimizing support methods.关键词
高应力/回采巷道/破坏机理/巷道支护Key words
high stress/mining roadway/destructive mechanism/roadway supporting分类
矿山工程引用本文复制引用
代卫林..深部高应力回采巷道破坏机理与支护方案优化[J].煤炭与化工,2025,48(5):32-37,45,7.基金项目
河北省自然科学基金资助项目(E2020402075) (E2020402075)