煤炭与化工2025,Vol.48Issue(5):38-41,4.DOI:10.19286/j.cnki.cci.2025.05.008
预掘卸压巷应力转移护巷技术实践
Technical practice of stress transfer for roadway protection in pre-excavated depressurized roadway
陈永青 1杨波 2孙亮 1王国举2
作者信息
- 1. 安徽省皖北煤电集团有限责任公司,安徽淮北 235100
- 2. 河北煤炭科学研究院有限公司,河北邢台 054000
- 折叠
摘要
Abstract
In order to ensure the stability of mountain roadway group and surrounding rock of silo roadway in Ⅱ 63 mining area,a pressure relief roadway was set in the middle of the stop-line of No.Ⅱ 635 Face and silo by using the stress transfer theory through field investigation and analysis.The pre-cracking scheme was designed and the parameters of pre-cracking were optimized to carry out pre-cracking.The practice showed that the pre-cracking effect was good,the advance abatement pressure of the mining face was cut off,and the stability of the mountain roadway group and the surrounding rock of the water bin roadway was guaranteed.关键词
卸压巷/参数设置/应力转移/超前预裂Key words
pressure relief roadway/parameter setting/stress transfer/pre-excavated分类
矿业与冶金引用本文复制引用
陈永青,杨波,孙亮,王国举..预掘卸压巷应力转移护巷技术实践[J].煤炭与化工,2025,48(5):38-41,4.