输水盾构隧洞预应力双层衬砌结构力学响应

Mechanical Re-Sponse of Prestressed Double-Layer Lining Structure of Water Conveyance Shield Tunnel

刘畅 1马晓斌 1王士民 1孟繁盛 2陈昱弛2

作者信息

  • 1. 西南交通大学 交通隧道工程教育部重点实验室,四川 成都 610031
  • 2. 中国水利水电第七工程局 成都水电建设工程有限公司,四川 成都 611100
  • 折叠

摘要

Abstract

In order to explore the mechanical response of prestressed double-layer lining structure during the construction and operation of water conveyance shield tunnel,taking the Pearl River Delta Water Resources Allocation Project as an example,a three-dimensional calcula-tion model of double-layer lining structure was established by finite element numerical simulation method,and the bearing capacity character-istics of double-layer lining structure with or without prestress were analyzed.The results show that when the internal water pressure does not exceed 0.9 MPa,the ordinary double-layer lining structure can meet the safety requirements and does not need to apply prestress.When the internal water pressure is too large,it is necessary to apply prestress to the double-layer lining structure to give full play to its bearing capaci-ty.Compared with the pre-stressed tension stage,the coordinated bearing capacity of the segment lining and the pre-stressed lining is stronger and the contact pressure is more fully transmitted in the water-filled operation stage.During the whole construction and operation stages,the displacement variation of the double-layer lining structure is small,and it has a good working state.

关键词

预应力双层衬砌/承载力学特性/有限元分析/输水盾构隧洞

Key words

prestressed double-layer lining/characteristics of bearing capacity/finite element analysis/water conveyance shield tunnel