| 注册
首页|期刊导航|全球能源互联网(英文)|Techno-economic modeling and analysis of a PV EV charged with battery energy storage system(BESS)on Kalimantan Island

Techno-economic modeling and analysis of a PV EV charged with battery energy storage system(BESS)on Kalimantan Island

Aripriharta Satria Adiguna Arif N.Afandi Muhammad Cahyo Bagaskoro

全球能源互联网(英文)2025,Vol.8Issue(2):225-239,15.
全球能源互联网(英文)2025,Vol.8Issue(2):225-239,15.DOI:10.1016/j.gloei.2025.01.003

Techno-economic modeling and analysis of a PV EV charged with battery energy storage system(BESS)on Kalimantan Island

Techno-economic modeling and analysis of a PV EV charged with battery energy storage system(BESS)on Kalimantan Island

Aripriharta 1Satria Adiguna 2Arif N.Afandi 1Muhammad Cahyo Bagaskoro2

作者信息

  • 1. Department of Electrical Engineering and Informatics,Faculty of Engineering,State University of Malang,Malang 65145,Indonesia||Center of Advanced Material and Renewable Energy(CAMRY UM),Indonesia
  • 2. Department of Electrical Engineering and Informatics,Faculty of Engineering,State University of Malang,Malang 65145,Indonesia
  • 折叠

摘要

关键词

Techno-economic analysis/Electric vehicle/Electric vehicle charger/PSO/GWO

Key words

Techno-economic analysis/Electric vehicle/Electric vehicle charger/PSO/GWO

引用本文复制引用

Aripriharta,Satria Adiguna,Arif N.Afandi,Muhammad Cahyo Bagaskoro..Techno-economic modeling and analysis of a PV EV charged with battery energy storage system(BESS)on Kalimantan Island[J].全球能源互联网(英文),2025,8(2):225-239,15.

基金项目

The research presented in this paper is supported by non-APBN UM 2024,Indonesia,with contract number 5.4.111/UN32.14.1/LT/2024. ()

全球能源互联网(英文)

2096-5117

访问量0
|
下载量0
段落导航相关论文