大跨隧道深切冲沟浅埋贯通段连续塌方控制措施研究

张晓军 孙耀明 赵家康

现代交通技术2025,Vol.22Issue(2):46-51,6.
现代交通技术2025,Vol.22Issue(2):46-51,6.

大跨隧道深切冲沟浅埋贯通段连续塌方控制措施研究

Research on Continuous Collapse Control Measures of the Shallow Buried Penetration Section of Deep-cut Trench of Large-span Tunnel

张晓军 1孙耀明 1赵家康1

作者信息

  • 1. 苏交科集团股份有限公司,南京 210019
  • 折叠

摘要

Abstract

The Luojiacun Tunnel in the expansion project of Chuxiong-Dali Expressway is a three-lane and large-span tunnel.To ensure the smooth opening of the tunnel,it is necessary to first determine the stability of the mountain and then study the treat-ment measures for landslides at deep-cut trenches.Based on the results of on-site exploration,analyze the mutual influence be-tween the left and right tunnels,overall geological conditions,geological characteristics and rock strata orientation,and study the relationship between cave collapse and surface cracks,and verify it through numerical simulation.The research results indi-cate that the overall stability of the mountain is affected by construction disturbances and continuous collapse,which cause funnel-shaped creep along the tunnel bedding direction and generate surface cracks.Based on the research,relevant preventive and control measures are proposed,and the research results can provide reference for similar projects.

关键词

大跨浅埋段/深切冲沟/连续塌方/控制措施

Key words

large-spanned and shallow-buried section/deep-cut trench/continuous collapse/control measure